bg decoration

Case Studies

RESIDENTIAL
Somerset Care Home, York

TPI undertook the full package of drylining, ceilings and taping and jointing works on this project creating multiple new bedrooms and communal areas. Works consisted of timber stud work, dot and dabbing to block work walls, MF and suspended ceilings with a tape and joint finish over two floors on the new extension.

FIT-OUT
Audemars Piguet, Manchester City Centre

TPI has successfully finished its most exclusive fit-out project yet, Taping and Jointing a top-tier space for Audemars Piguet watches in the heart of Manchester City Centre. Our dedicated teams often worked around the clock to bring this stunning four-floor fit-out to life. The project featured intricate double coving details, ceiling rafts, elegantly curved walls and ceilings, along with numerous meters of stylish trims and low-level skirting.

COMMERCIAL
RESIDENTIAL
Broadway Central, Glasgow City Centre.

The TPI team successfully completed the Taping and Jointing package to over 430 bedrooms across 16 floors in a large student accommodation located in the heart of Glasgow. Following the complete BG specifications, our teams demonstrated exceptional performance throughout this fast-paced project.

RESIDENTIAL
Warren Park, Persimmon Homes

TPI is currently engaged in the comprehensive Drylining and Taping and Jointing package at Warren Park, Bessacar Doncaster for Persimmon Homes. Our drywall and taping teams are actively working on 236 new build homes as part of Phase 4 of this extensive development.

COMMERCIAL
INDUSTRIAL
Rolls Royce, Goodwood.

TPI successfully undertook the Taping and Jointing package for 35,000m² of jumbo walls at the expansive multi-commercial unit project located at the Rolls Royce headquarters in Goodwood, Chichester. Our large on-site team demonstrated exceptional performance, ensuring the project progressed swiftly and adhered to the pressured programme.

HEALTHCARE
MODULAR
Bournemouth Royal, Hospital.

TPI successfully undertook the complete Taping and Jointing package across five floors of a substantial modular hospital project, encompassing a total area of 37,000m2. Adhering strictly to the full Knauf specifications, our teams delivered the project with exceptional quality.

RESIDENTIAL
New Build houses, Bradford.

TPI is currently engaged in drylining and taping and jointing works for a private housing development consisting of 37 large bespoke plots in Bradford. Our scope of work includes drylining, dot and dab application, and achieving a high-quality taped and jointed finish.

main
COMMERCIAL
The Light Cinema, Huddersfield

Our teams successfully finished extensive areas of walls, ceilings, bulkheads, and columns to establish a new multi-screen cinema, restaurants, and entertainment venues spanning across three floors on this huge project.

main
COMMERCIAL
FIT-OUT
Aston martin, Bentley, Rolls Royce showrooms, Leeds

TPI completed all taping and jointing works for this sizable and upscale project, establishing three luxurious car showrooms for a returning client after successfully completing the Ferrari Showroom project.

main
COMMERCIAL
Old Market Place, Wakefield

TPI Taping successfully finished the taping and jointing of thousands of square metres of Gyptone ceiling on this project, utilising scaffolds and mewps.

main
RESIDENTIAL
Printworks, Bradford

The teams finalised the taping and jointing package for 137 apartments, corridors, and communal areas in the second phase of this extensive project, following the successful completion of 144 apartments in Phase 1 for the same client.

main
EDUCATIONAL
IQRA School, Clapham

TPI Taping completed all the taping and jointing works for a returning client's new school construction project, involving extensive work across two floors, covering thousands of metres.

  • 1
  • 2
  • 3